top of page

Additions to Jurong Camp - sheltered linkways
Partner
Oct-19 to Feb-20
Autobuilds Construction Pte Ltd
Scope of work
Supply and installation of 4mm
thk. Aluminium composited
panel roofing, 3mm thk.
Aluminium perforated panel
screen
Project Description
Project Dates
Proposed Additions &
Alterations to the existing Jurong
Camp involving the construction
of sheltered linkways on lots
02343w, 03814x, 03815l,
03804w pt, 03811a pt, 99678t pt,
99679a pt mk 06, 00135n pt,
01509l pt, 99867v pt, 99872t pt
mk 07, 01428a pt mk 09 at Upper
Jurong Road

Project Gallery

bottom of page

