top of page

New detached dwelling at 1 Seletar Crescent
Partner
Jul-19 to Jan-20
PSP Solutions Engineering Pte Ltd
Scope of work
Supply and installation of LCP
Snaplock system metal roofing,
Aluminium hollow trellis,
Aluminium louvres with netting,
galvanized steel sub-frame,
10mmthk Aluminium honeycom
panel roofing, Aluminium trellis
swing door, steel railing, steel
structure feature wall, powder
coating metal door handler and
galvanized steel grating
Project Description
Project Dates
Proposed erection of a
2-storey envelope control
detached dwelling house with
a mezzanine and an attic on
lot 9759T MK 18 at 1 Seletar
Crescent

Project Gallery

bottom of page

